Tanjung Bin - Malaysia / Power Plant |
Construction of 2 Fly ash concrete Silos , h= 42 m |
Under construction |
Mudajaya (Malaysia) |
Recife - Brazil / Refinery |
EPC of 2 new Concrete Chimneys, h= 82 m with brick liner Ø = 5000 mm. Foundation included |
Under construction |
Alusa / Petrobras (Brazil) |
Narva - Estonia / Power Plant |
EPC of 1 Concrete Chimney, h= 200 m with one steel liner (+ option for a second one) |
Under commissioning |
Alstom Estonia (Estonia) |
Manjung 4 - Malaysia / Power Plant |
EPC of 1 Concrete Chimney, h= 200 m with one steel liner protected by borosilicate |
Under commissioning |
Mudajaya (Malaysia) |
Manjung 4 - Malaysia / Power Plant |
Construction of 1 Fly ash and 1 bottom ash concrete Silos , h= 37 and 39 m |
2013 |
Mudajaya (Malaysia) |
Corse - France / Power Plant |
EPC of set of five new Single Skin Steel Stacks and ducting system |
2013 |
EDF (France) |
Keban Agung - Indonesia / Power Plant |
EPC of 2 Concrete Chimneys, h= 130 m with borosilicate applied on inner surface of windshield |
2012/20013 |
Priamanaya (Indonesia) |
Pedra do Sino - Brazil / Refinery |
EC of one new Single Skin Steel Stack, h= 90 m |
2013 |
Cimento Tupi (Brazil) |
Hong Kong - China / Waste Treatment Plant |
EPC of four new Single Skin Steel Stacks, h= 55 m |
2012 |
Veolia (France) |
Rostov - Russia / Glass Factory |
EPC of new Double Skin Steel Stack, h= 100 m |
2012 |
GUARDIAN GLASS (USA) |
Pisa - Italy / Glass Factory |
EPC of new Double Skin Steel Stack, h= 55 m |
2011 |
Saint Gobain (France) |
Baku - Azerbaijan / Waste Treatment Plant |
EPC of two new Double Skin Steel Stack, h= 60 m |
2011 |
LAB (France) |
Poland / Sulphur Stack |
EPC of new Double Skin Steel Stack, h= 60 m with refractory lining |
2011 |
KTI TECNIMONT (Italy) |
Arques - France / Waste Treatment Plant |
EPC of new Double Skin Steel Stack, h= 48 m |
2011 |
LAB (France) |
Serbia / Sulphur stack |
EPC of new Double Skin Steel Stack, h= 60 m |
2011 |
JOHN ZINK (Germany) |
France / Insulation Industry |
EPC of three new single wall and Double Skin Steel Stacks, h= 38 m, 45 m and 75 m |
2010 |
EWK (Germany) |
Koniambo - New Caledonia / Nickel Plant |
EPC of new Concrete/Steel Chimney, h= 135 m and 2 liners - Foundation included |
2010 |
TECHNIP (France) |
Guadeloupe/Waste Treatment Plant |
EPC of new Double Skin Steel Stack, h= 47 m with FRP liner |
2010 |
LAB (France) |
Turano Lodigiano - Italy / Power Plant |
EPC of new Concrete Chimney, h= 100 m and 2 steel liners Ø= 6100 mm |
2009-2010 |
ANSALDO (Italy) |
Sao Paulo - Brazil / Glass Factory |
EPC of new Concrete Chimney, h= 103 m with brick liner Ø= 6400 mm. Foundation included |
2009 |
GUARDIAN GLASS / CTE (France) |
Obeikan - Saudi Arabia/ Glass Factory |
EPC of new Double Skin Steel Stack, h= 100 m - Foundation included |
2009 |
OBEIKAN GLASS COMPANY (KSA) |
France / Concrete Production Unit |
EPC of new Single Skin Steel Stack, h= 82 m |
2009 |
HOLCIM (France) |
France / Refinery/ Sulphur Incinerator Plant |
EPC of new Double Skin Steel Stack, h= 75 m |
2009 |
JE JACOBS / INEOS (France) |
France / Insulation Industry |
EPC of two new Steel Stack, h=38 m and 45 m, Ducting, fans, noise absorber, precipitator etc |
2009 |
ISOVER (France) |
France / Refinery (Sulphur Incinerator Plant) |
EPC of new Double Skin Steel Stack, h= 90 m and smoke ducting |
2009 |
TOTAL (France) |
Algeria / Power Plant |
EPC of four new Multiflue Single Skin Steel Stack, h= 45 m |
2008 |
IHI HEAVY INDUSTRY (Japan) |
France / Glass Factory |
EPC of new Double Skin Steel Stack, h= 60 m |
2008 |
KERAGLASS (France) |