PDF FilePDF

Tanjung Bin - Malaysia / Power Plant

Construction of 2 Fly ash concrete Silos , h= 42 m

Under construction

Mudajaya (Malaysia)

Recife - Brazil / Refinery

EPC of 2 new Concrete Chimneys, h= 82 m with brick liner Ø = 5000 mm. Foundation included

Under construction

Alusa / Petrobras (Brazil)

Narva - Estonia / Power Plant

EPC of 1 Concrete Chimney, h= 200 m with one steel liner (+ option for a second one)

Under commissioning

Alstom Estonia (Estonia)

Manjung 4 - Malaysia / Power Plant

EPC of 1 Concrete Chimney, h= 200 m with one steel liner protected by borosilicate

Under commissioning

Mudajaya (Malaysia)

Manjung 4 - Malaysia / Power Plant

Construction of 1 Fly ash and 1 bottom ash concrete Silos , h= 37 and 39 m

2013

Mudajaya (Malaysia)

Corse - France / Power Plant

EPC of set of five new Single Skin Steel Stacks and ducting system

2013

EDF (France)

Keban Agung - Indonesia / Power Plant

EPC of 2 Concrete Chimneys, h= 130 m with borosilicate applied on inner surface of windshield

2012/20013

Priamanaya (Indonesia)

Pedra do Sino - Brazil / Refinery

EC of one new Single Skin Steel Stack, h= 90 m

2013

Cimento Tupi (Brazil)

Hong Kong - China / Waste Treatment Plant

EPC of four new Single Skin Steel Stacks, h= 55 m

2012

Veolia (France)

Rostov - Russia / Glass Factory

EPC of new Double Skin Steel Stack, h= 100 m

2012

GUARDIAN GLASS (USA)

Pisa - Italy / Glass Factory

EPC of new Double Skin Steel Stack, h= 55 m

2011

Saint Gobain (France)

Baku - Azerbaijan / Waste Treatment Plant

EPC of two new Double Skin Steel Stack, h= 60 m

2011

LAB (France)

Poland / Sulphur Stack

EPC of new Double Skin Steel Stack, h= 60 m with refractory lining

2011

KTI TECNIMONT (Italy)

Arques - France / Waste Treatment Plant

EPC of new Double Skin Steel Stack, h= 48 m

2011

LAB (France)

Serbia / Sulphur stack

EPC of new Double Skin Steel Stack, h= 60 m

2011

JOHN ZINK (Germany)

France / Insulation Industry

EPC of three new single wall and Double Skin Steel Stacks, h= 38 m, 45 m and 75 m

2010

EWK (Germany)

Koniambo - New Caledonia / Nickel Plant

EPC of new Concrete/Steel Chimney, h= 135 m and 2 liners - Foundation included

2010

TECHNIP (France)

Guadeloupe/Waste Treatment Plant

EPC of new Double Skin Steel Stack, h= 47 m with FRP liner

2010

LAB (France)

Turano Lodigiano - Italy / Power Plant

EPC of new Concrete Chimney, h= 100 m and 2 steel liners Ø= 6100 mm

2009-2010

ANSALDO (Italy)

Sao Paulo - Brazil / Glass Factory

EPC of new Concrete Chimney, h= 103 m with brick liner Ø= 6400 mm. Foundation included

2009

GUARDIAN GLASS / CTE (France)

Obeikan - Saudi Arabia/ Glass Factory

EPC of new Double Skin Steel Stack, h= 100 m - Foundation included

2009

OBEIKAN GLASS COMPANY (KSA)

France / Concrete Production Unit

EPC of new Single Skin Steel Stack, h= 82 m

2009

HOLCIM (France)

France / Refinery/ Sulphur Incinerator Plant

EPC of new Double Skin Steel Stack, h= 75 m

2009

JE JACOBS / INEOS (France)

France / Insulation Industry

EPC of two new Steel Stack, h=38 m and 45 m, Ducting, fans, noise absorber, precipitator etc

2009

ISOVER (France)

France / Refinery (Sulphur Incinerator Plant)

EPC of new Double Skin Steel Stack, h= 90 m and smoke ducting

2009

TOTAL (France)

Algeria / Power Plant

EPC of four new Multiflue Single Skin Steel Stack, h= 45 m

2008

IHI HEAVY INDUSTRY (Japan)

France / Glass Factory

EPC of new Double Skin Steel Stack, h= 60 m

2008

KERAGLASS (France)