PDF FilePDF

OI Manufacturing

2014

São Paulo

Brazil

Furnace #H8, melting cross fire:


Furnace and regenerators steel partial reconstruction;
Buckstays, Crown binding steel, insulation binding steel, Ports and Doghouses;
New Working End layout;
Alcove modification;
Forehearths steel partial reconstruction and new steel installation;
Alcove & Forehearths binding superstructure dismantling and reinstallation.

OI

80 tons

Crisnova – Caudete  (Vidrala Group)

2014

 

Spain

Furnace CR2-129sq, End port, new rebuilding:


Completely new steel structure of furnace;
Partial steel of regenerators;
Modification of working end;
Forehearths steel casings elevation;
Furnace, regenerators and forehearths walkways modification / installation;
Pressure control valve installation at exhaust channel.

Horn/Vidrala

230 tons

Vetropack

2014

St Prex

Switzerland

Forehearth #214 rebuild 2014:


New distributor layout;
Forehearth support, walkways, access and casing installation;
Machine distributor platform installation;
Modification of building roof.

HORN

 

Isover SG Billesholm

2013/2014

Billesholm

Sweden

Furnace T4 and Feeder rebuild 2013/2014:


Electrical furnace 42 sqm Fibre production;
Furnace, canal and forehearths steel partial reconstruction.

Saint Gobain Isover

 

Keraglass

2013/2014

Bagneaux sur Loing

France

Furnace #11 renovation 2013/2014:


Partial furnace steel structure modification;
Bottom Plates, Buckstays AVB, Fusion walls tank plates, Crown binding steel, Insulation binding steel;
Superstructure steel supports and  monorails.

Keraglass

32 tons

O.I. Manufacturing

2013

Veauche

France

Furnace #4 renovation 2013:


Furnace steel structure modification, Walkways, Furnace cooling and New forehearth casing #41.

OI

85 tons

O.I. Manufacturing

2013

Puy Guillaume

France

Modification of production lines M52, M53 and M54:


Structures of machines support;
Structure and walkways of forehearths, including stairs and handrails;
Forehearths casings.

OI

100 tons

Verallia Gran Canaria

2013

Telde - Gran Canaria

Spain

Furnace 45sqm, melting end port with regenerators.
Furnace, regenerators and forehearths completely reconstruction.

Verallia & LaCruz Ingenieros

185 tons

Ardagh Glass

2013

Irvine - Portland

United Kingdom

Furnace P5, melting end port:


Furnace overall reconstruction;
Regenerators partial reconstruction.

HORN

186 tons / 330 m² (walkways)

OI Manufacturing

2013

São Paulo

Brazil

Furnace #H4, melting cross fire:


Furnace and regenerators steel partial reconstruction;
Buckstays, Crown binding steel, insulation binding steel, Ports and Doghouses;
Working End, Alcoves and Forehearths steel partial reconstruction;
WE, Alcoves & Forehearths binding superstructure dismantling and reinstallation.

OI

35 tons

Bormioli Rocco

2013

Masnieres

France

Furnace #5 - Repair 2013:


Modification of Working End;
New layout of forehearths, supports, casings & superstructure;
Modification and installation of forehearths combustion systems;
Modification and installation of forehearths cooling system.

AGMS

20 tons

Phoenicia Glass Works

2013

Yeruham

Israel

Furnace 83sqm, melting end port with regenerators;
Furnace, regenerators and forehearths completely reconstruction.

GlassTech

225 tons

Barbosa & Almeida

2013

Marinha Grande

Portugal

Furnace C. Partial Reconstruction:


Partial steel structure of regenerators;
Buckstays, Crown Binding steel and Insulation binding steel.

Lizmontagens, SA.

30 tons

Verallia Cognac

2012/2013

Cognac

France

Furnace H3, melting end port with regenerators:


Furnace partial reconstruction;
Regenerators partial reconstruction;
Forehearths total reconstruction;

S.E.T.

70 tons

Verallia Alver

2012/2013

Oran

Algeria

Furnace #H2, 115 m2  Recuperator cross fire:


Furnace And Forehearths steel partial reconstruction;
Recuperator and steel support structure completely new.

GlassTech

204 tons

Verallia Montblanc

2012

Tarragona

Spain

Furnace H1, melting end port with regenerators and Morgan:


Furnace overall reconstruction;
Regenerators partial reconstruction.

Verallia

202 tons / 370 m²

AGSM

2012

Chateauroux

France

Furnace 9, oxi – combustion:


Furnace, throat & forehearths partial reconstruction.

AGSM

15 tons

Ardagh Glass

2012

Knottingley

United Kingdom

Furnace K71, melting end port:


Furnace overall reconstruction;
Regenerators partial reconstruction.

HORN

147 tons / 400 m²

Isover Orange

2012

Orange

United Kingdom

Furnace 133 m2 electrical melting:


Fibre production;
Furnace, canal and forehearths steel partial reconstruction.

Saint Gobain Isover

 

Verallia Lonigo

2011/2012

Lonigo

Italy

Furnace #H31, 115 m2 melting cross fire:


Furnace and regenerators steel partial reconstruction;
Working end steel total reconstruction;
Feeders #3110 and  #3120, superstructure overall reconstruction;
Cooling tank and boosting system;
Walkways of furnace, melter area and  ports complete.

GlassTech

150 tons
Cast iron: 7 ton
Walkways: 270 m2
Grating: 116 m2

Saint-Gobain Emballage

2011/2012

Saint-Romain

France

Furnace SRP2. Partial Reconstruction:


Manufacturing and assembly of:
Steel structure furnace – complete;
Steel structure of regenerators – partial;
Steel structure feeders channels and superstructure;
Electrodes cooling system platforms;
Cooling system for tank, crown.

SGE

150 tons

Saint Gobain Desjonqueres

2011/2012

Mers Les Bains    

France

Furnace #2 electrical melting, overall reconstruction, including working end and feeders.


Manufacturing and assembly of:
Feeders support structure and IS machines, and Walkways;
Complete working end, channel and superstructure;
Feeder 22 complete, channel, superstructure;
Feeder 21 complete, channel and superstructure;
Walkways around the feeders, IS machines and Distributor.

TecniFrance

Steel structure and Walkways: 45 ton
Feeders and working end: 20 tons
Walkways: 180 m2

Guardian Glass

2011/2012

Rostov

Russia

New float furnace, at Rostov plant,  Russia:


Supervision and assembly of:
Melter steel structure, working end, distributor, including furnace support structure;
Walkways;
Cooling systems;
Inversion and melt rate regulation valves;
Tin bath.

 

1.700 tons

Saint Gobain Desjonqueres

2011

Mers Les Bains

France

Feeder #62, Intermediate repair
Manufacturing and assembly of:
Intermediate channel for feeder, understructure and superstructure, including modification of support structure.

Temi

1,5 tons

Gallo Vidro (Vidrala Group)

2011

Marinha Grande

Portugal

Furnace 4, melting end port: total reconstruction


Regenerators, manufacturing and assembly of new steel structure;
Furnace -melter – Partial supply of steel structure;
Furnace - melter – Modification of steel structure;
Furnace - throat – Supply and assembly of new steel structure;
Working end – Assembly of new steel structure, metal casings and superstructure;
Feeders – Disassembly and further assembly of overall steel superstructure.

 SORG/Vidrala (Walkways)

190 tons

O.I. Manufacturing

2010/2011

Alloa, Scotland

United Kingdom

Furnace #F81, 70 m2 melting cross fire:


Furnace and regenerators steel structure partial reconstruction;
Working end steel total reconstruction;
Cooling tank and boosting system.

OI

160 tons

Saint Gobain Desjonqueres

2010

Mers Les Bains    

France

Furnace 3, recuperator furnace, partial rebuilding:


Steel structure furnace, recuperator supports and working end;
Working end structure steel;
Forehearths casing and superstructure steel;
Walkways for furnace.

Temi

30 tons

BaVidro, SA

2010

Venda Nova - Amadora

Portugal

Furnace VN3 – Melting end port:


New Furnace;
Steel structure furnace, regenerators and working end;
Working end casing and superstructure steel;
Forehearths casing and superstructure steel;
Walkways for furnace and regenerator.

Owens-Illinois

220 tons

BaVidro, SA

2010

Avintes

Portugal

Furnace AV4 – Melting end port:


Full Reconstruction;
Steel structure furnace, regenerators and working end;
Working end casing and superstructure steel;
Forehearths casing and superstructure steel;
Walkways for furnace and regenerator.

Sorg / Owens-Illinois

200 tons

O.I. Manufacturing

2010

Sevilha

Spain

Furnace H100, melting end port:


Furnace and regenerators steel partial reconstruction;
Disassembly and reassembly steel structure.

OI

20 tons

O.I. Manufacturing

2009/2010

Vayres

France

Furnace 1, melting cross fire:


Furnace and regenerators steel partial reconstruction;
Working end steel total reconstruction;
Cooling tank and boosting system.

OI/Temi

140 tons

Crisnova – Caudete  (Vidrala Group)

2009

 

Spain

Furnace CR1-151sq, End port, new rebuilding:


Steel structure furnace, working end and regenerators;
Feeders steel casing and superstructure;
840 sq. meters of walkways.

Sorg/Vidrala

550 tons

BaVidro, Sa. Venda Nova

2008/2009

Venda nova - Amadora

Portugal

Furnace 2, End port, New rebuilding:


All steel structure of furnace and regenerators;
Modification project refractory of melter;
Modification project steel structure furnace/regenerators;

Lizmontagens/Heye Glass

270 tons

S. G. Vetri

2008

Gazzo Veronese

Italy

Furnace 71. Waste Gas channel (by-pass).

S.G. Vetri/Gtech

15 tons

Vetrobalsamo SPA

2008

Milan

Italy

Oxi-gas recuperator furnace, partial rebuilding

Vetrobalsamo  SPA

15 tons

S. G. Vetri

2008

Gazzo Veronese

Italy

Furnace F2, End port:


Aditional Regenerator crown cooling;
Walway batch silo.

S.G. Vetri/Gtech

7 tons

O. I. Glasspack GmbH

2008

Holzminden

Germany

Furnace 2,  End port, partial rebuilding
Melter crown engineering support.

Lizmontagens/O.I.

35 tons

Rhodia Silices

2008

Collonges au Mt. D'Or

France

Furnace VT 11000, End port, partial rebuilding:


(New project engineering regenerators steel structure);
All steel structure of regenerators;
Partial steel structure of furnace.

Lizmontagens/Rhodia

60 tons

Manufacture du Verre (Vidrala Group)

2008

 

Belgium

Furnace MDV3, End port, new rebuilding:


Steel structure furnace and regenerators;
Feeders steel casing and superstructure;
750 sq. meters of walkways.

Sorg/Vidrala

500 tons

Barbosa & Almeida

2008

Marinha Grande

Portugal

Furnace A. Partial Reconstruction:


Steel structure furnace and regenerators;
Steel structure feeders support.

Owens/Illinois

50 tons

Barbosa & Almeida

2008

Marinha Grande

Portugal

Furnace B. Full Reconstruction:


Steel structure furnace and regenerators;
Steel structure feeders support;
Feeders and superstructure steel channels;
Electrodes cooling system platforms;

Owens/Illinois

290 tons

Ursa France SAS

2008

St. Avold

France

Furnace VSM 35m2. Full Reconstruction Manufacturing and assembly of: Furnace steel structure Feeder and superstructure steel channels.

Sorg

40 tons

Saint-Gobain Vetri

2007/2008

Pescia

Italy

Furnace H82. Full Reconstruction Manufacturing and assembly of: Steel structure furnace and regenerators. Steel structure feeders support Feeders and superstructure steel channels Electrodes cooling system platforms.

SGV/GTech

550 tons

O.I. Manufacturing

2007

Reims

France

Furnace 3, melting cross fire. Intermediate Reconstruction Manufacturing and supply of throat cooling system.

 

0,5 tons

Castellar Vidrio (Vidrala Group)

2007

Barcelona

Spain

Furnace 1 melting end port. Intermediate Reconstruction Partial manufacturing and assembly of steel structure, passerelles and fan system.

Vidrala/Owens Illinois

40 tons

Saver Glass – Société Autonome de Verreries

2007

 

France

Furnace 3, Intermediate Reconstruction Manufacturing and assembly of feeders steel structure. Water jackets, batch charger and feeders.

 

9 tons

Saint-Gobain Vetrotex

2007

Alcalá  - Madrid

Spain

Manufacturing and assembly of steel structure furnace and channels Reconstruction : Furnace AR Fiberglass.

SG-Vetrotex

60 tons

Saint-Gobain Emballage

2006

Lagnieu

France

Manufacturing and assembly of steel structure and feeders Furnace 1, melting end port: Reconstruction and enlargement.

SGE

450 tons

Gallo Vidro (Vidrala Group)

2006

Marinha Grande

Portugal

Manufacturing and assembly of steel structure Furnace 4, melting end port: Intermediate Reconstruction.

SORG

25 tons

Barbosa & Almeida

2006

Avintes

Portugal

Manufacturing and assembly of steel structure Furnace 2, melting end port: Overall Construction.

Owens Illinois

190 tons

Saint-Gobain Emballage

2006

Chalon

France

Manufacturing and assembly of steel structure Furnace 2, melting end port: Intermediate repair.

SGE

15 tons

Holophane

2006

Les Andelys

France

Engineering, manufacturing and assembly of steel structure Furnace  5, melting end port: Reconstruction and enlargement.

Projeref/Lizmontagens

90 tons

Saint-Gobain Emballage

2005

Chalon

France

Manufacturing and assembly of steel structure Furnace 1, melting end port: Intermediate repair.

SGE

30 tons

Saint-Gobain Emballage

2005

Saint Romain Le Pui

France

Manufacturing and assembly of steel structure Furnace 1, melting end port: Intermediate repair.

SGE

20 tons

Duralex, SAS

2005

Rive de Gier

France

Engineering, manufacturing and assembly of steel structure Electrical Furnace, Tableware: Reconstruction and enlargement.

Projeref/Lizmontagens

40 tons

Barbosa & Almeida

2004

Marinha Grande

Portugal

Manufacturing and assembly of steel structure. Reconstruction and enlargement: Furnace C, melting end port.

Owens Illinois

200 tons