OI Manufacturing |
2014 |
São Paulo |
Brazil |
Furnace #H8, melting cross fire:
|
OI |
80 tons |
Crisnova – Caudete (Vidrala Group) |
2014 |
|
Spain |
Furnace CR2-129sq, End port, new rebuilding:
|
Horn/Vidrala |
230 tons |
Vetropack |
2014 |
St Prex |
Switzerland |
Forehearth #214 rebuild 2014:
|
HORN |
|
Isover SG Billesholm |
2013/2014 |
Billesholm |
Sweden |
Furnace T4 and Feeder rebuild 2013/2014:
|
Saint Gobain Isover |
|
Keraglass |
2013/2014 |
Bagneaux sur Loing |
France |
Furnace #11 renovation 2013/2014:
|
Keraglass |
32 tons |
O.I. Manufacturing |
2013 |
Veauche |
France |
Furnace #4 renovation 2013:
|
OI |
85 tons |
O.I. Manufacturing |
2013 |
Puy Guillaume |
France |
Modification of production lines M52, M53 and M54:
|
OI |
100 tons |
Verallia Gran Canaria |
2013 |
Telde - Gran Canaria |
Spain |
Furnace 45sqm, melting end port with regenerators. |
Verallia & LaCruz Ingenieros |
185 tons |
Ardagh Glass |
2013 |
Irvine - Portland |
United Kingdom |
Furnace P5, melting end port:
|
HORN |
186 tons / 330 m² (walkways) |
OI Manufacturing |
2013 |
São Paulo |
Brazil |
Furnace #H4, melting cross fire:
|
OI |
35 tons |
Bormioli Rocco |
2013 |
Masnieres |
France |
Furnace #5 - Repair 2013:
|
AGMS |
20 tons |
Phoenicia Glass Works |
2013 |
Yeruham |
Israel |
Furnace 83sqm, melting end port with regenerators; |
GlassTech |
225 tons |
Barbosa & Almeida |
2013 |
Marinha Grande |
Portugal |
Furnace C. Partial Reconstruction:
|
Lizmontagens, SA. |
30 tons |
Verallia Cognac |
2012/2013 |
Cognac |
France |
Furnace H3, melting end port with regenerators:
|
S.E.T. |
70 tons |
Verallia Alver |
2012/2013 |
Oran |
Algeria |
Furnace #H2, 115 m2 Recuperator cross fire:
|
GlassTech |
204 tons |
Verallia Montblanc |
2012 |
Tarragona |
Spain |
Furnace H1, melting end port with regenerators and Morgan:
|
Verallia |
202 tons / 370 m² |
AGSM |
2012 |
Chateauroux |
France |
Furnace 9, oxi – combustion:
|
AGSM |
15 tons |
Ardagh Glass |
2012 |
Knottingley |
United Kingdom |
Furnace K71, melting end port:
|
HORN |
147 tons / 400 m² |
Isover Orange |
2012 |
Orange |
United Kingdom |
Furnace 133 m2 electrical melting:
|
Saint Gobain Isover |
|
Verallia Lonigo |
2011/2012 |
Lonigo |
Italy |
Furnace #H31, 115 m2 melting cross fire:
|
GlassTech |
150 tons |
Saint-Gobain Emballage |
2011/2012 |
Saint-Romain |
France |
Furnace SRP2. Partial Reconstruction:
|
SGE |
150 tons |
Saint Gobain Desjonqueres |
2011/2012 |
Mers Les Bains |
France |
Furnace #2 electrical melting, overall reconstruction, including working end and feeders.
|
TecniFrance |
Steel structure and Walkways: 45 ton |
Guardian Glass |
2011/2012 |
Rostov |
Russia |
New float furnace, at Rostov plant, Russia:
|
|
1.700 tons |
Saint Gobain Desjonqueres |
2011 |
Mers Les Bains |
France |
Feeder #62, Intermediate repair |
Temi |
1,5 tons |
Gallo Vidro (Vidrala Group) |
2011 |
Marinha Grande |
Portugal |
Furnace 4, melting end port: total reconstruction
|
SORG/Vidrala (Walkways) |
190 tons |
O.I. Manufacturing |
2010/2011 |
Alloa, Scotland |
United Kingdom |
Furnace #F81, 70 m2 melting cross fire:
|
OI |
160 tons |
Saint Gobain Desjonqueres |
2010 |
Mers Les Bains |
France |
Furnace 3, recuperator furnace, partial rebuilding:
|
Temi |
30 tons |
BaVidro, SA |
2010 |
Venda Nova - Amadora |
Portugal |
Furnace VN3 – Melting end port:
|
Owens-Illinois |
220 tons |
BaVidro, SA |
2010 |
Avintes |
Portugal |
Furnace AV4 – Melting end port:
|
Sorg / Owens-Illinois |
200 tons |
O.I. Manufacturing |
2010 |
Sevilha |
Spain |
Furnace H100, melting end port:
|
OI |
20 tons |
O.I. Manufacturing |
2009/2010 |
Vayres |
France |
Furnace 1, melting cross fire:
|
OI/Temi |
140 tons |
Crisnova – Caudete (Vidrala Group) |
2009 |
|
Spain |
Furnace CR1-151sq, End port, new rebuilding:
|
Sorg/Vidrala |
550 tons |
BaVidro, Sa. Venda Nova |
2008/2009 |
Venda nova - Amadora |
Portugal |
Furnace 2, End port, New rebuilding:
|
Lizmontagens/Heye Glass |
270 tons |
S. G. Vetri |
2008 |
Gazzo Veronese |
Italy |
Furnace 71. Waste Gas channel (by-pass). |
S.G. Vetri/Gtech |
15 tons |
Vetrobalsamo SPA |
2008 |
Milan |
Italy |
Oxi-gas recuperator furnace, partial rebuilding |
Vetrobalsamo SPA |
15 tons |
S. G. Vetri |
2008 |
Gazzo Veronese |
Italy |
Furnace F2, End port:
|
S.G. Vetri/Gtech |
7 tons |
O. I. Glasspack GmbH |
2008 |
Holzminden |
Germany |
Furnace 2, End port, partial rebuilding |
Lizmontagens/O.I. |
35 tons |
Rhodia Silices |
2008 |
Collonges au Mt. D'Or |
France |
Furnace VT 11000, End port, partial rebuilding:
|
Lizmontagens/Rhodia |
60 tons |
Manufacture du Verre (Vidrala Group) |
2008 |
|
Belgium |
Furnace MDV3, End port, new rebuilding:
|
Sorg/Vidrala |
500 tons |
Barbosa & Almeida |
2008 |
Marinha Grande |
Portugal |
Furnace A. Partial Reconstruction:
|
Owens/Illinois |
50 tons |
Barbosa & Almeida |
2008 |
Marinha Grande |
Portugal |
Furnace B. Full Reconstruction:
|
Owens/Illinois |
290 tons |
Ursa France SAS |
2008 |
St. Avold |
France |
Furnace VSM 35m2. Full Reconstruction Manufacturing and assembly of: Furnace steel structure Feeder and superstructure steel channels. |
Sorg |
40 tons |
Saint-Gobain Vetri |
2007/2008 |
Pescia |
Italy |
Furnace H82. Full Reconstruction Manufacturing and assembly of: Steel structure furnace and regenerators. Steel structure feeders support Feeders and superstructure steel channels Electrodes cooling system platforms. |
SGV/GTech |
550 tons |
O.I. Manufacturing |
2007 |
Reims |
France |
Furnace 3, melting cross fire. Intermediate Reconstruction Manufacturing and supply of throat cooling system. |
0,5 tons |
|
Castellar Vidrio (Vidrala Group) |
2007 |
Barcelona |
Spain |
Furnace 1 melting end port. Intermediate Reconstruction Partial manufacturing and assembly of steel structure, passerelles and fan system. |
Vidrala/Owens Illinois |
40 tons |
Saver Glass – Société Autonome de Verreries |
2007 |
|
France |
Furnace 3, Intermediate Reconstruction Manufacturing and assembly of feeders steel structure. Water jackets, batch charger and feeders. |
|
9 tons |
Saint-Gobain Vetrotex |
2007 |
Alcalá - Madrid |
Spain |
Manufacturing and assembly of steel structure furnace and channels Reconstruction : Furnace AR Fiberglass. |
SG-Vetrotex |
60 tons |
Saint-Gobain Emballage |
2006 |
Lagnieu |
France |
Manufacturing and assembly of steel structure and feeders Furnace 1, melting end port: Reconstruction and enlargement. |
SGE |
450 tons |
Gallo Vidro (Vidrala Group) |
2006 |
Marinha Grande |
Portugal |
Manufacturing and assembly of steel structure Furnace 4, melting end port: Intermediate Reconstruction. |
SORG |
25 tons |
Barbosa & Almeida |
2006 |
Avintes |
Portugal |
Manufacturing and assembly of steel structure Furnace 2, melting end port: Overall Construction. |
Owens Illinois |
190 tons |
Saint-Gobain Emballage |
2006 |
Chalon |
France |
Manufacturing and assembly of steel structure Furnace 2, melting end port: Intermediate repair. |
SGE |
15 tons |
Holophane |
2006 |
Les Andelys |
France |
Engineering, manufacturing and assembly of steel structure Furnace 5, melting end port: Reconstruction and enlargement. |
Projeref/Lizmontagens |
90 tons |
Saint-Gobain Emballage |
2005 |
Chalon |
France |
Manufacturing and assembly of steel structure Furnace 1, melting end port: Intermediate repair. |
SGE |
30 tons |
Saint-Gobain Emballage |
2005 |
Saint Romain Le Pui |
France |
Manufacturing and assembly of steel structure Furnace 1, melting end port: Intermediate repair. |
SGE |
20 tons |
Duralex, SAS |
2005 |
Rive de Gier |
France |
Engineering, manufacturing and assembly of steel structure Electrical Furnace, Tableware: Reconstruction and enlargement. |
Projeref/Lizmontagens |
40 tons |
Barbosa & Almeida |
2004 |
Marinha Grande |
Portugal |
Manufacturing and assembly of steel structure. Reconstruction and enlargement: Furnace C, melting end port. |
Owens Illinois |
200 tons |